Abstract
Within the current regulatory model of the Brazilian electricity sector, the lack of specific regulation for the market power reserve services in the long term leads to the underestimation of generation assets, especially in cases where additional investment would enable increasing the installed capacity of existing hydroelectric plants at low cost. A correct evaluation of such investment would have important consequences in the medium term, it would reduce the social energy shortage costs, both preventive, reflected by thermal dispatch, as well corrective, incurred in the recovery of production losses and others due to long-duration interruptions of energy supply.No atual modelo regulatório do setor elétrico brasileiro, a ausência de regulação específica para comercializar serviços de reserva de potência, em horizonte de longo prazo, acarreta a subvalorização dos ativos de geração, notadamente nos casos em que investimentos adicionais permitiriam ampliar a capacidade instalada de usinas hidrelétricas existentes, a baixo custo. A correta valoração desse tipo de investimento teria consequências importantes em médio prazo, pois permitiria reduzir os custos sociais de interrupção, tanto os preventivos, refletidos por despacho térmico, quanto os corretivos, incorridos na recuperação de perdas de produção e outras devidas a interrupções de longa duração.
Cite
CITATION STYLE
Ramos, D. S., Morozowski Filho, M., Schilling, M. T., & Rosa, J. A. de O. (2015). Expansão da capacidade do atendimento de ponta no Sistema Interligado Brasileiro. Revista USP, (104), 103–124. https://doi.org/10.11606/issn.2316-9036.v0i104p103-124
Register to see more suggestions
Mendeley helps you to discover research relevant for your work.