A case study of twin bored tunnelling under mixed-face soil-Bendemeer MRT station project (Downtown Line 3), Singapore

3Citations
Citations of this article
5Readers
Mendeley users who have this article in their library.

Abstract

The Bendemeer Station project is part of the construction of MRT Downtown Line 3 (DTL-3) in Singapore, under Contract C933. High variation in geological condition along the alignment was encountered during the tunneling works in this project. The transitions from Old Alluvium soil towards the soft soils of Kallang Formation create the challenging mixed-face soil condition at the tunnel face. This sudden change of tunnelling medium creates the difficulties to control face pressure and over excavation which can cause substantial ground loss and movements. This paper mainly focuses on the ground responses caused by twin bored tunnelling under mixed-face soil condition and the implementation of building protection measures to the existing late 19th& early 20th centuries shophouses which the tunnelhad undercrossed in mixed-face soil condition.

Cite

CITATION STYLE

APA

Ong, C. W., Ee, J. P., Su, T., Yong, K. Y., & Kulaindran, A. (2015). A case study of twin bored tunnelling under mixed-face soil-Bendemeer MRT station project (Downtown Line 3), Singapore. In 15th Asian Regional Conference on Soil Mechanics and Geotechnical Engineering, ARC 2015: New Innovations and Sustainability (pp. 176–181). Asian Regional Conference on Soil Mechanics and Geotechnical Engineering. https://doi.org/10.3208/jgssp.SIN-03

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free