Condition assessment of PCI bridge girder a result of the reduction prestressing force

1Citations
Citations of this article
8Readers
Mendeley users who have this article in their library.

Abstract

PCI bridge girders is known and widely used for many construction e.g.: bridge, wharf, flyover, and other application. PC Bridge girders have two types: Pre - tensioned girders and post - tensioned girders. In pre tensioned girders, prestressing in carried out first then after that the fresh concrete poured. The prestressing process in only carried off after the concrete has sufficient strength. In this study, analysis was conducted for PCI bridge girder with span is 40 meters. Based on the data geometry bridge dimension girder, material girder, and material strands cable, it will be analyzed to calculate the natural frequencies and moment capacity using finite element program (Midas/Civil program). So it can be estimated how much the percentage reduction prestress force on the bridge until PCI bridge structure collapses. From the calculation, it found that the pattern comparison between reduction prestressing force and natural frequency are linear. These results are also similar for natural frequency versus moment capacity.PCI bridge will collapse when the reduction prestreesing force of 45 % to 50 % from the total loss of prestressing. © Owned by the authors, published by EDP Sciences, 2014.

Cite

CITATION STYLE

APA

Suangga, M., Hidayat, I., & Lutter, B. (2014). Condition assessment of PCI bridge girder a result of the reduction prestressing force. In EPJ Web of Conferences (Vol. 68). EDP Sciences. https://doi.org/10.1051/epjconf/20146800012

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free