Simultaneous optimisation of cable connection schemes and capacity for offshore wind farms via a modified bat algorithm

25Citations
Citations of this article
26Readers
Mendeley users who have this article in their library.

Abstract

Offshore wind energy has attracted worldwide attention and investments in the last decade due to the stability and abundance of wind resources. As one of the main components of this, internal array cables have a great impact on the levelised cost of energy of offshore wind farms, and thus their connection layout is a matter of concern. In this paper, a classical mathematical problem-the traveling salesman problem, which belongs to the field of graph theory-is applied to solve the offshore wind farm cable connection layout optimization problem. Both the capital investment on cables, cable laying, and the cost of power losses associated with array cables are considered in the proposed model. A modified bat algorithm is presented to resolve the problem. Furthermore, a cable crossing detection method is also adopted to avoid obtaining crossed cable connection layouts. The effectiveness was verified through a case study.

Cite

CITATION STYLE

APA

Qi, Y., Hou, P., Yang, L., & Yang, G. (2019). Simultaneous optimisation of cable connection schemes and capacity for offshore wind farms via a modified bat algorithm. Applied Sciences (Switzerland), 9(2). https://doi.org/10.3390/app9020265

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free