Very Short Term Load Forecasting Using Hybrid Regression and Interval Type -1 Fuzzy Inference

3Citations
Citations of this article
138Readers
Mendeley users who have this article in their library.
Get full text

Abstract

The growth of electricity consumption in this world is getting higher. The operation of the electric power starts from the generation system, Transmission system, and distribution system up to the load. All systems must be well integrated. Power generation settings should be appropriate. Therefore, load forecasting is important to do in generation system so that it is not too high from the existing load. There are two kinds of load forecasting; Short Term and Very Short Term. The very short term load forecasting is to forecast the load amount in every 30 minutes on one day before the day of loading. This research aims to discuss very short term load forecasting which uses hybrid regression method in the primary data of its loading history forecasting with Interval Type - 1 Fuzzy Inference System (IT-1 FIS). The finding indicates that the forecasting in 2015 obtained error of 0,9558%, and 1,4226% in 2016.

Cite

CITATION STYLE

APA

Jamaaluddin, J., & Robandi, I. (2018). Very Short Term Load Forecasting Using Hybrid Regression and Interval Type -1 Fuzzy Inference. In IOP Conference Series: Materials Science and Engineering (Vol. 434). Institute of Physics Publishing. https://doi.org/10.1088/1757-899X/434/1/012209

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free