Case study on the socio-economic benefit of allowing active power curtailment to postpone grid upgrades

3Citations
Citations of this article
8Readers
Mendeley users who have this article in their library.

Abstract

The penetration of distributed generation is rapidly increasing in the power system. Traditionally, a fit-and-forget approach has been applied for grid integration of distributed generation, by investing in a grid capacity that can deal with worst-case situations. However, there is now increasing interest for the possible cost savings that can be achieved through more active network management. This paper presents a case study on the possible socio-economic benefit of postponing a grid upgrade in an area of surplus generation. Two alternatives for grid integration of an 8 MW run-on-river hydro power plant in the southern part of Norway are investigated: (i) grid upgrade; and (ii) active power curtailment whenever needed to avoid network congestion. This study shows that cost savings corresponding to 13% of the investment cost for the grid upgrade is possible through active power curtailment.

Cite

CITATION STYLE

APA

Kolstad, M. L., Wolfgang, O., & Josefsen, R. H. (2017). Case study on the socio-economic benefit of allowing active power curtailment to postpone grid upgrades. Energies, 10(5). https://doi.org/10.3390/en10050632

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free