Accidental release of chlorine from a storage facility and an on-site emergency mock drill: A case study

7Citations
Citations of this article
60Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

In the current industrial scenario there is a serious need for formulating strategies to handle hazardous substances in the safest way. Manufacture, storage, and use of hazardous substances pose a serious risk to industry, people, and the environment. Accidental release of toxic chemicals can lead to emergencies. An emergency response plan (ERP) is inevitable to minimize the adverse effects of such releases. The on-site emergency plan is an integral component of any process safety and risk management system. This paper deals with an on-site emergency response plan for a chlorine manufacturing industry. It was developed on the basis of a previous study on chlorine release and a full scale mock drill has been conducted for testing the plan. Results indicated that properly trained personnel can effectively handle each level of incidents occurring in the process plant. As an extensive guideline to the district level government authorities for off-site emergency planning, risk zone has also been estimated with reference to a chlorine exposure threshold of 3 ppm.

Cite

CITATION STYLE

APA

Soman, A. R., & Sundararaj, G. (2015). Accidental release of chlorine from a storage facility and an on-site emergency mock drill: A case study. Scientific World Journal, 2015. https://doi.org/10.1155/2015/483216

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free