Profit maximization of GENCO's using an elephant herding optimization algorithm

2Citations
Citations of this article
15Readers
Mendeley users who have this article in their library.

Abstract

When electrical power systems are restructured managers look for satisfying several objectives that include: the working cost minimization and the profit for the unit commitment problems maximization. Power generating companies that comply with the two above mentioned objectives are able to provide good quality and reliable power at a cheaper cost. The individual power producers, schedule their generating units in such a way that they gain maximum profit. This is known as Profit Based Unit Commitment (PBUC). The target of this proposed work is to obtain an optimum generating schedule of the Power Generating Companies (GENCO's) and maximize the profit of power generating companies when the system is under various constraints like forecasted demand, minimum start-up /shutdown time, spot price, forecasted reserve and ramp rate limits. In order to address this problem, a new meta-heuristic approach called Elephant Herding Optimization (EHO) algorithm is presented. The method may help to solve the complex PBUC problems in the deregulated open market. The effectiveness of projected EHO is tested on various systems with various market conditions. The comparison of the test results with other optimization methods are presented and discussed taking into account their convergence characteristics, solution superiority and reliability.

Cite

CITATION STYLE

APA

Ravichandran, S., & Subramanian, M. (2020). Profit maximization of GENCO’s using an elephant herding optimization algorithm. Studies in Informatics and Control, 29(1), 131–140. https://doi.org/10.24846/v29i1y202013

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free