Investigation and optimization of the cable force of a combined highway and railway steel truss cable-stayed bridge in completion state

4Citations
Citations of this article
6Readers
Mendeley users who have this article in their library.

Abstract

In order to study the reasonable cable force of a highway and rail dual-purpose steel truss cable-stayed bridge in the completion state, this paper employs four methods, i.e. the rigid supported continuous beam method, bending minimum energy method, influence matrix method and BP neural network method combined with a genetic algorithm. The Baijusi Yangtze river bridge, with a main span of 660 m in the completion state, is chosen as the object of study. Through comparative analysis, it is found that the rigid supported continuous beam combined with the influence matrix method can determine the reasonable cable force of the highway and rail dual-purpose steel truss cable-stayed bridge more quickly and effectively.

Cite

CITATION STYLE

APA

Li, H., Liu, S., Shan, Q., Zhang, L., & Wu, B. (2019). Investigation and optimization of the cable force of a combined highway and railway steel truss cable-stayed bridge in completion state. In Vibroengineering Procedia (Vol. 28, pp. 217–222). EXTRICA. https://doi.org/10.21595/vp.2019.21052

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free