Traffic condition with road upgrading during construction and operation stages based on level-of-service (LOS)

4Citations
Citations of this article
17Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

In this study, traffic survey was done at signalized intersection of both ends of an upgrading road during morning and afternoon peak hours throughout construction period. The intersections of Tudan Road located at Miri City in Sarawak State, Malaysia were chosen as study sites. The aim of this research was to investigate the traffic condition for the signalized intersections of a R3 secondary road that being upgrading to standard U5 dual carriageway during peak hours for construction and operation stages. Data collected from these sites were analyzed according to Highway Capacity Manual (HCM) 2010. From the results, the level-of-services (LOS) of Kuala Baram By Pass Road intersection improved from Level F to Level E at operation stage for weekday during peak hours in the morning. LOS of Lutong-Kuala Baram Road intersection at construction stage were Level C during peak hours in the morning and Level D during peak hours in the afternoon for weekends. However, the LOS during both peak hours for weekends were projected to improve to Level B at the operation stage. It proved that the road construction has affected LOS, and this temporary issue can be solved after the upgraded road is in operation.

Cite

CITATION STYLE

APA

Tay, A. C., & Lee, H. H. (2018). Traffic condition with road upgrading during construction and operation stages based on level-of-service (LOS). In IOP Conference Series: Materials Science and Engineering (Vol. 344). Institute of Physics Publishing. https://doi.org/10.1088/1757-899X/344/1/012018

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free