Research for Global Coordinating Method of Large Equipment Scheduling in Construction Site

0Citations
Citations of this article
7Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

Much energy is dissipated when large equipment moves slowly. Generally, equipment scheduling at construction site is supposed to minimize equipment slowdown and deadhead moving. Table methods are always adopted to optimize transfer sequence, but the feasible solution is well disappointing. For the acceptable solution relevant to task points in construction equipment scheduling, transfer table is divided into four regions. After proper augmentation and deflation, the acceptable solution evolves into global coordinating solution of construction scheduling, which contributes to minimizing slowdown and deadhead mileages. This method has been verified in practical engineering and is a significant reference on decision making of construction equipment scheduling.

Cite

CITATION STYLE

APA

Yao, R., Ma, G., & Jin, L. (2015). Research for Global Coordinating Method of Large Equipment Scheduling in Construction Site. Discrete Dynamics in Nature and Society, 2015. https://doi.org/10.1155/2015/127574

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free