Multi-stage parallel machines and lot-streaming scheduling problems-a case study for solar cell industry

2Citations
Citations of this article
14Readers
Mendeley users who have this article in their library.

Abstract

This research focuses on a parallel machines scheduling problem considering lot streaming which is similar to the traditional hybrid flow shop scheduling (HFS). In a typical HFS with parallel machines problem, the allocation of machine resources for each order should be determined in advance. In addition, the size of each sublot is splited by parallel machines configuration. However, allocation of machine resources, sublot size and lot sequence are highly mutual influence. If allocation of machine resources has been determined, adjustment on production sequence is unable to reduce production makespan. Without splitting a given job into sublots, the production scheduling cannot have overlapping of successive operations in multi-stage parallel machines environment thereby contributing to the best production scheduling. Therefore, this research motivated from a solar cell industry is going to explore these issues. The multi-stage and parallel-machines scheduling problem in the solar cell industry simultaneously considers the optimal sublot size, sublot sequence, parallel machines sublot scheduling and machine configurations through dynamically allocating all sublot to parallel machines. We formulate this problem as a mixed integer linear programming (MILP) model considering the practical characteristics including parallel machines, dedicated machines, sequence-independent setup time, and sequence-dependent setup time. A hybrid-coded particle swarm optimization (HCPSO) is developed to find a nearoptimal solution. At the end of this study, the result of this research will compare with the optimization method of mixed integer linear programming and case study.

Cite

CITATION STYLE

APA

Wang, H. S., Wang, L. C., Chen, T. L., Chen, Y. Y., & Cheng, C. Y. (2013). Multi-stage parallel machines and lot-streaming scheduling problems-a case study for solar cell industry. In IFIP Advances in Information and Communication Technology (Vol. 414, pp. 151–158). Springer New York LLC. https://doi.org/10.1007/978-3-642-41266-0_19

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free