Design Method and Verification of Electroosmosis-Vacuum Preloading Method for Sand-Interlayered Soft Foundation

5Citations
Citations of this article
10Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

The design method of electroosmosis-vacuum preloading for soft foundation treatment is not systematic and complete, thereby restricting the application of the technology in engineering. A design method for the electroosmosis-vacuum preloading treatment of sand-interlayered soft foundation is therefore presented. A compressible electrical prefabricated vertical drain is developed, and a vacuum sealing and draining system is designed for the application of the electroosmosis-vacuum preloading in sand-interlayered soft foundation. Calculation formulas of site resistance considering the interlayer and interface resistivity of the electrode are established to design the power supply and electrical circuit. A simple numerical simulation method is proposed to predict the ground settlement treated by electroosmosis-vacuum preloading. A field test of electroosmosis-vacuum preloading is designed using the suggested method, and comparison tests between the electroosmosis-vacuum preloading and the vacuum preloading are performed to verify the proposed technique. The test results show that the proposed design method is reasonable for the design of electroosmosis-vacuum preloading in engineering.

Cite

CITATION STYLE

APA

Cui, Y., Tu, J., Wang, X., Diao, H., & Ge, Q. (2020). Design Method and Verification of Electroosmosis-Vacuum Preloading Method for Sand-Interlayered Soft Foundation. Advances in Civil Engineering, 2020. https://doi.org/10.1155/2020/1929842

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free