Background: Simultaneous nitrogen, phosphorous and COD removal in a pilot-scale enhanced Sequencing Batch Reactor (eSBR) was investigated. Methods: The reactor consisted of a pre-anoxic zone and internal recycle and was fed with synthetic wastewater. The study was performed by operating the reactor in 6-hour cycles in three different operational modes during a time frame of 279 days. Results: Under the best operational conditions, the average removal rate of COD, TN, and TP were obtained as 93.52, 88.31, and 97.56%, respectively. Conclusions: A significant denitrifying phosphorus removal (more than 80%) occurred at run1 and 3 which started the cycle under anoxic condition.
CITATION STYLE
Ghehi, T. J., Mortezaeifar, S., Gholami, M., Kalantary, R. R., & Mahvi, A. H. (2014). Performance evaluation of enhanced SBR in simultaneous removal of nitrogen and phosphorous. Journal of Environmental Health Science and Engineering, 12(1). https://doi.org/10.1186/s40201-014-0134-2
Mendeley helps you to discover research relevant for your work.