Abstract
In the shipbuilding industry, there is still little discussion and analysis of risk management in the shipbuilding process. From previous studies, it is probable that the material/component group has a high percentage of shipbuilding delays, but there are no publications that discuss ship components specifically. Various models have been developed related to risk assessment in shipbuilding, but mostly discussed on shipbuilding construction, company management and work safety in shipyards. This paper discusses the need for planning and risk assessment models for component availability in the construction of new ships in Indonesia. The aim is to review the methods that will be used in risk assessment, combined with quantitative evaluation methods in the procurement of component materials and ship building installations. The development of methods for risk analysis, with a combination of Failure Mode and Effect Analysis (FMEA) and Bayesian Network (BN) approaches, it is hoped that the most critical risks can be identified so that risk evaluation actions can be carried out.
Author supplied keywords
Cite
CITATION STYLE
Ariany, Z., Pitana, T., & Vanany, I. (2022). Review of the Risk Assessment Methods for Shipbuilding in Indonesia. In IOP Conference Series: Earth and Environmental Science (Vol. 972). IOP Publishing Ltd. https://doi.org/10.1088/1755-1315/972/1/012056
Register to see more suggestions
Mendeley helps you to discover research relevant for your work.