Early risks identification on sources and causes waste road construction project materials

2Citations
Citations of this article
17Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

Waste material affects the road construction project consisting of ready mix concrete, lean concrete, B aggregate, landfill and cement. Identify risks by looking at the source and causes of waste material in the five materials. The source and causes of waste material for road construction do not yet exist. So it is necessary to take literature from a simplified building project so that it can be used for road construction projects with the help of experts. Risk identification is carried out with primary data, namely the questionnaire, then consulted by experts with the Delphi Method with three stages. The results of the Delphi method produce each of the causes of waste material for road construction projects that result in the identification of Early Risks. Ready Mix concrete has 8 sources of waste material and 21 causes of waste material. Concrete Concrete has 7 sources of waste material and 18 causes of waste material. Aggregate B has 7 sources of waste material and 15 causes of waste material. Landfill has 8 sources of waste material and 26 causes of waste material. Cement has 7 sources of waste material and 31 causes of waste material.

Cite

CITATION STYLE

APA

Waty, M., & Sulistio, H. (2019). Early risks identification on sources and causes waste road construction project materials. In IOP Conference Series: Materials Science and Engineering (Vol. 508). Institute of Physics Publishing. https://doi.org/10.1088/1757-899X/508/1/012008

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free