Analysis Work Standardization Using the Standardized Work Combination Table on CNC of Mission Case Line Process at PT Astra Otoparts, Tbk-Nusametal Division

4Citations
Citations of this article
51Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

PT Astra Otoparts Tbk.-Nusametal Division is manufacturing company that produce various types of metal part. In the Machining section, there is a new line producing parts of Mission Case. This line has not had the standardized work as an operator's guide in running its production process. Hence, the Standardized Work Combination Table (SWCT) on Mission Case line is created to ensure operator works properly according to the work standard that has been made, to achieve predetermined production, and to prevent product defects. The creation of SWCT resulted in operator cycle time of 151 seconds/3 pcs and 166 seconds/3 pcs for cycle time of machine with operator idle time for 15 seconds that is 2 seconds faster than takt time.

Cite

CITATION STYLE

APA

Aisyah, S., Purba, H. H., & Dwi Setiaji, S. (2020). Analysis Work Standardization Using the Standardized Work Combination Table on CNC of Mission Case Line Process at PT Astra Otoparts, Tbk-Nusametal Division. In IOP Conference Series: Materials Science and Engineering (Vol. 1003). IOP Publishing Ltd. https://doi.org/10.1088/1757-899X/1003/1/012044

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free