A summary of bim cases based on paihekou pump station

0Citations
Citations of this article
5Readers
Mendeley users who have this article in their library.

Abstract

BIM technology has been widely used in ordinary residential buildings, but the use of REVIT for water projects is still very little. Aiming at the fast and accurate modeling of pump station in BIM design, design the first built after emptying the method as a whole. The drawing of the curved channel is studied, and a complete splicing design scheme for pump station is proposed. The whole pumping station is divided into blocks, separately modeled and supplemented with details, and then joined together to form a complete building model. The complex problem of pump station design has been solved. In this paper, the feasibility and efficiency of the scheme are verified by the analysis of specific examples.

Cite

CITATION STYLE

APA

Zhu, J., Cao, R., Xu, D., & Zhang, W. (2019). A summary of bim cases based on paihekou pump station. In E3S Web of Conferences (Vol. 136). EDP Sciences. https://doi.org/10.1051/e3sconf/201913603026

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free