ANALISIS DAYA DUKUNG TIANG PANCANG BERDASARKAN HASIL DATA KALENDERING PADA PROYEK JEMBATAN PILE SLAB BUKIT RAWI

  • Azzahra O
N/ACitations
Citations of this article
6Readers
Mendeley users who have this article in their library.

Abstract

The construction of a pile slab bridge on the Palangka Raya-Bagugus road section was built to deal with flooding that often occurs due to overflowing water from the Kahayan river. The plan uses a pile foundation because the type of soil at that location is swamp and peat soil which has a very low bearing capacity. Soil bearing capacity can be obtained by carrying out soil investigations such as calendering investigations and PDA tests. The goal of this research is to analyze the bearing capacity of a single pile foundation using the results of calendaring data with Danish formulas and PDA test interpretation data. Data analysis and calculations on the ability of a single pile to bear weight at that spot B-12-C with the results of calendaring data Qu 358,520 tons and Qa 119.507 tons, while with the results of PDA Test Qu 185.90 tons, Qs 117.7 tons and Qb 68.3 tons. The findings from the point analysis and pile-loading calculation B-12-D with the results of calendaring data Qu 501,404 tons and Qa 164,135 tons while with the results of PDA Test Qu 165.00 tons, Qs 115.8 tons and Qb 49.2 tons.

Cite

CITATION STYLE

APA

Azzahra, O. G. (2023). ANALISIS DAYA DUKUNG TIANG PANCANG BERDASARKAN HASIL DATA KALENDERING PADA PROYEK JEMBATAN PILE SLAB BUKIT RAWI. INFO-TEKNIK, 24(2), 137. https://doi.org/10.20527/infotek.v24i2.14794

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free