In the process of urban rail transit construction, underground excavation method is often used in subway station construction. Based on a large number of measured data of Qingdao Metro Line 3, this paper analyzes and studies the ground subsidence law of long-span shallow buried excavation station. The research results show that vertical surface settlement will be caused by the excavation of both sides of the guide hole, but the settlement is relatively small, basically within -10 mm. Large surface settlement will occur during the middle or middle guide hole excavation, with a large settlement up to -30 mm. Through data fitting, it is found that the regression analysis using cubic polynomial of one degree can get better fitting effect. The horizontal surface variation rules of underground excavation stations are affected by the tunnel depth, geological conditions, management level of monitoring units, monitoring layout and monitoring accuracy, and so on. The differences in horizontal surface deformation and settlement between stations are large. Wannianquan Road Station basically conforms to the deformation law of ground settlement trough in Peck, and Junfeng Road Station directly above belongs to the whole subsidence type. This study has accumulated a large number of surface settlement monitoring data, which can provide a certain reference for the subsequent design of similar lines.
CITATION STYLE
Yan, J., Liu, X., Bai, X., Zhang, M., Jiao, Y., Jing, D., … Kang, W. (2021). Research on Surface Subsidence of Long-Span Underground Tunnel. Advances in Civil Engineering, 2021. https://doi.org/10.1155/2021/6643892
Mendeley helps you to discover research relevant for your work.