Construction Time-Cost Optimization of River Dredging Project in Cold Region Based on NSGA-II Algorithm

2Citations
Citations of this article
5Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

The construction of water conservancy projects is increasingly restricted by non-technical factors such as climate, environment and society, so it is particularly important to optimize it to improve the benefits of construction enterprises. Taking a river dredging project in cold region as an example, this paper uses NSGA-II algorithm to carry out multi-objective optimization of the construction time-cost, and uses MATLAB software to compile the construction optimization program of dredging project. Finally, the optimal combination of construction time and cost is obtained. The results show that the optimization results are in line with the actual situation of the project and save about 10% of the investment for the project. The method in this paper can provide useful reference for the optimization control of the construction progress of the actual project.

Cite

CITATION STYLE

APA

Feng, X. (2019). Construction Time-Cost Optimization of River Dredging Project in Cold Region Based on NSGA-II Algorithm. In IOP Conference Series: Earth and Environmental Science (Vol. 371). Institute of Physics Publishing. https://doi.org/10.1088/1755-1315/371/2/022032

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free