Abstract
The hardware under test (HUT) in a power hardware in the loop (PHIL) implementation can have a significant effect on overall system stability. In some cases, the system under investigation will be unstable unless the HUT is already connected and operating. Accordingly, initialization of the real-time simulation can be difficult, and may lead to abnormal parameters of frequency and voltage. Therefore, a method to initialize the simulation appropriately without the HUT is proposed in this contribution. Once the initialization is accomplished a synchronization process is also proposed. The synchronization process depends on the selected method for initialization and therefore both methods need to be compatible. In this contribution, a recommended practice for the initialization of PHIL simulations for synchronous power systems is presented. Experimental validation of the proposed method for a Great Britain network case study demonstrates the effectiveness of the approach.
Author supplied keywords
Cite
CITATION STYLE
Guillo-Sansano, E., Syed, M. H., Roscoe, A. J., & Burt, G. M. (2018). Initialization and synchronization of power hardware-in-the-loop simulations: A Great Britain network case study. Energies, 11(5). https://doi.org/10.3390/en11051087
Register to see more suggestions
Mendeley helps you to discover research relevant for your work.