Upgrade of the taskila wwtp with an mbr line: The first treatment results, performance assessment and lessons learnt

2Citations
Citations of this article
16Readers
Mendeley users who have this article in their library.

Abstract

In this paper, we present the first results of a large-scale membrane bioreactor application implemented for increasing the wastewater treatment plant capacity. The Taskila plant in Finland was upgraded in 2018 and is now operated as a hybrid system with parallel membrane bioreactor and conventional biological lines. The results showed that membrane filtration improved the plant performance significantly in terms of the solids and pathogens removal. Nitrogen removal has been stable with the current operating set-points and notably better than before the plant expansion. The analysis using key performance indicators showed that there were no significant differences in operational expenditures between the membrane and conventional lines. The membrane filtration results highlight the importance of maintaining the good sludge filterability properties that enable higher operational fluxes and reduced energy consumption. The low membrane aeration flow-rate mode, the standard operating mode with good sludge filterability, enabled reduction of total aeration energy consumption by 34% for the membrane bioreactor, including both activated sludge and membrane aeration. Finetuning of the hybrid plant is still going on and, therefore, improved overall results are expected in the forthcoming years.

Cite

CITATION STYLE

APA

Haimi, H., Risteelä, S., Dipofi, M., & Lahtinen, J. (2020). Upgrade of the taskila wwtp with an mbr line: The first treatment results, performance assessment and lessons learnt. Water Practice and Technology, 15(4), 1111–1125. https://doi.org/10.2166/wpt.2020.084

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free