Due-window assignment and scheduling are important issues in modern manufacturing management. In this note we consider single-machine due-window assignment and scheduling with job-dependent aging effects and deteriorating maintenance. The objective is to find jointly the optimal time to perform maintenance, the optimal location and size of the due-window, and the optimal job sequence to minimize the total earliness, tardiness, and due-window related costs. We show that the problem can be optimally solved in O(n4) time. We also show that a special case of the problem can be optimally solved by a lower order algorithm.
CITATION STYLE
Sorapong, B. (2012). Okra (Abelmoschus esculentus (L.) Moench) as a valuable vegetable of the world. Ratarstvo i Povrtarstvo, 49(1), 105–112. https://doi.org/10.5937/ratpov49-1172
Mendeley helps you to discover research relevant for your work.