Abstract
Industry 4.0 and lean production has become the focus of manufacturing. A current issue is to analyse the performance of the assembly line balancing. This study focus on distinguishing the factors influencing the assembly line balancing. The one-way ANOVA method is applied to explore the significant degree of distinguished factors. And regression model is built to find key points. The maximal task time (tmax ), the quantity of tasks (n), and degree of convergence of precedence graph (conv) are critical for the performance of assembly line balancing. The conclusion will do a favor to the lean production in the manufacturing.
Cite
CITATION STYLE
Chen, J., & Hu, J. (2017). The Influencing Factor Analysis on the Performance Evaluation of Assembly Line Balancing Problem Level 1 (SALBP-1) Based on ANOVA Method. In IOP Conference Series: Materials Science and Engineering (Vol. 212). Institute of Physics Publishing. https://doi.org/10.1088/1757-899X/212/1/012008
Register to see more suggestions
Mendeley helps you to discover research relevant for your work.