Improving accuracy of wind resource assessment through feedback loops of operational performance data: A case study in South Africa

2Citations
Citations of this article
12Readers
Mendeley users who have this article in their library.

Abstract

This study addresses two key objectives using operational performance data from most of the Round 1 wind farms connected to the grid in South Africa: benchmarking of wind farm performance and validation of the pre-construction energy yield assessments. These wind farms were found to perform in line with internationally reported levels of wind farm availability, with a mean energy-based availability of 97.8% during the first two years of operation. The pre-construction yield assessments used for financing in 2012 were found to over-predict project yield (P50) by 4.9%. This was consistent with other validation studies for Europe and North America. It was also noted that all projects exceed the pre-construction P90 estimate. The reasons for this discrepancy were identified, with the largest cause of error being wind flow and wake-modelling errors. Following a reassessment using up to date methodologies from 2018, the mean bias in pre-construction predictions was 1.4%.

Cite

CITATION STYLE

APA

Pullinger, D., Ali, A., Hill, N., Zhang, M., & Crutchley, T. (2019). Improving accuracy of wind resource assessment through feedback loops of operational performance data: A case study in South Africa. Journal of Energy in Southern Africa, 30(3), 1–10. https://doi.org/10.17159/2413-3051/2019/v30i3a5669

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free