Dynamic robust generation-transmission expansion planning in the presence of wind farms under long- A nd short-term uncertainties

13Citations
Citations of this article
14Readers
Mendeley users who have this article in their library.

Abstract

The main goal of generation expansion planning (GEP) and transmission expansion planning (TEP) is to expand the power system to satisfy the increasing demand of electricity while maintaining efficient operation of the system. The major objective of this study is to propose a dynamic, robust GEP-TEP expansion planning in the presence of wind farms considering both long- A nd short-term uncertainties. The suggested model allows implementing information-gap decision theory on multiyear long-term uncertainties, such as demand growth and future increase in production capacity to decrease the risk in longterm decisions. Additionally, a scenario-based approach is employed for short-term uncertainties in demand and wind power production in a 1-year time horizon. The main advantage of the proposed model is to enhance the power system robustness against the uncertainties corresponding to forecast errors. To verify the robustness of the suggested expansion planning model, it is applied to the Garver 6-bus and IEEE 24-bus test systems.

Cite

CITATION STYLE

APA

Ahmadi, S., Mavalizadeh, H., Ghadimi, A. A., Miveh, M. R., & Ahmadi, A. (2020). Dynamic robust generation-transmission expansion planning in the presence of wind farms under long- A nd short-term uncertainties. IET Generation, Transmission and Distribution, 14(23), 5418–5427. https://doi.org/10.1049/iet-gtd.2019.1838

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free