Reducción del tiempo de terminación en la programación de la producción de una línea de Flujo Híbrida Flexible (HFS)

5Citations
Citations of this article
44Readers
Mendeley users who have this article in their library.

Abstract

A production programming model is proposed through the application of a metaheuristic technique to achieve the reduction of the makespan. A company in the textile sector was chosen as a case study and a production programming methodology for hybrid-flexible flow shop configurations was developed with the coding of a simple genetic algorithm. The algorithm gives good quality results with very reasonable computational times and coefficients of variation of about 2% in relation to the values of the makespan. This model also shows a level of efficiency comparable to other applications found in the literature, in which evolutionary algorithms are used. It is concluded that from the encoding of the production system and its main restrictions, the genetic algorithm well performs production scheduling by reducing the makespan.

Cite

CITATION STYLE

APA

Lopez, J. C., Giraldo, J. A., & Arango, J. A. (2015). Reducción del tiempo de terminación en la programación de la producción de una línea de Flujo Híbrida Flexible (HFS). Informacion Tecnologica, 26(3), 157–172. https://doi.org/10.4067/S0718-07642015000300019

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free