A short-term optimal scheduling model for wind-solar-hydro hybrid generation system with cascade hydropower considering regulation reserve and spinning reserve requirements

46Citations
Citations of this article
30Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

In order to meet the challenges brought by the high penetration of intermittent and fluctuating wind and solar power, a short-term optimal scheduling model for wind-solar-hydro hybrid generation system with cascade hydropower is established with the objective of minimizing the amount of abandoned wind, solar and hydro power and maximizing the stored energy of hydro stations. Cascade hydropower is considered to provide spinning reserve and regulation reserve to ensure the security of system. Mixed Integer Linear Programming (MILP) method is used for the short-term optimal schedule of wind-solar-hydro hybrid generation system. The case studies show that spinning reserve and regulation reserve are beneficial to the hybrid generation system, and verify the practical applicability of the proposed model.

Cite

CITATION STYLE

APA

Xie, J., Zheng, Y., Pan, X., Zheng, Y., Zhang, L., & Zhan, Y. (2021). A short-term optimal scheduling model for wind-solar-hydro hybrid generation system with cascade hydropower considering regulation reserve and spinning reserve requirements. IEEE Access, 9, 10765–10777. https://doi.org/10.1109/ACCESS.2021.3049280

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free