Scheduling on a Single Machine and Parallel Machines with Batch Deliveries and Potential Disruption

1Citations
Citations of this article
8Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

In this paper, we study several coordinated production-delivery scheduling problems with potential disruption motivated by a supply chain in the manufacturing industry. Both single-machine environment and identical parallel-machine environment are considered in the production part. The jobs finished on the machines are delivered to the same customer in batches. Each delivery batch has a capacity and incurs a delivery cost. There is a situation that a possible disruption in the production part may occur at some particular time and will last for a period of time with a probability. We consider both resumable case and nonresumable case where a job does not need (needs) to restart if it is disrupted for a resumable (nonresumable) case. The objective is to find a coordinated schedule of production and delivery that minimizes the expected total flow times plus the delivery costs. We first present some properties and analyze the NP-hard complexity for four various problems. For the corresponding single-machine and parallel-machine scheduling problems, pseudo-polynomial-time algorithms and fully polynomial-time approximation schemes (FPTASs) are presented in this paper, respectively.

Cite

CITATION STYLE

APA

Gong, H., Zhang, Y., & Yuan, P. (2020). Scheduling on a Single Machine and Parallel Machines with Batch Deliveries and Potential Disruption. Complexity, 2020. https://doi.org/10.1155/2020/6840471

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free