Tests of three 1/8-scale curved girder bridge models are being conducted in the Civil Engineering Department at the University of Rhode Island at Kingston, with the purpose of confirming analytical solutions. This is a report on one of these tests, a three-girder, two span model of a 160 ft long prototype bridge. The model actually simulates a highway ramp for a typical city interchange. Our objective as stated in the beginning was to try to prove that Professor Lavelles analysis is accurate. Results from testing this three-girder model bridge indicates that the analysis is conservative and accurate within limits tolerable to design.
Mendeley helps you to discover research relevant for your work.
CITATION STYLE
Clarke, C. B. (1966). Testing of a Model Curved Steel Girder Bridge. Engineering Journal, 3(3), 106–112. https://doi.org/10.62913/engj.v3i3.1256