Optimal one-wafer cyclic scheduling of single-arm multicluster tools with two-space buffering modules

36Citations
Citations of this article
5Readers
Mendeley users who have this article in their library.
Get full text

Abstract

A multi-cluster tool is composed of a number of individual cluster tools linked by buffering modules (BMs). The capacity of a BM can be one or two. Aiming at finding an optimal one-wafer cyclic schedule, this paper explores the effect of two-space BMs on the performance of a multi-cluster tool. A Petri net (PN) model is developed to model it by extending resource-oriented PNs. The dynamic behavior of robot waiting and tasks, process modules, and buffers is well described by the model. This paper shows that there is always a one-wafer cyclic schedule that reaches the lower bound of the cycle time of a process-bound tool. Furthermore, a closed-form algorithm is revealed to find such a schedule for the first time for such multi-cluster tools. Illustrative examples are given to show the application and power of the proposed method.

Cite

CITATION STYLE

APA

Yang, F. J., Wu, N. Q., Qiao, Y., & Zhou, M. C. (2014). Optimal one-wafer cyclic scheduling of single-arm multicluster tools with two-space buffering modules. IEEE Transactions on Systems, Man, and Cybernetics: Systems, 44(12), 1584–1597. https://doi.org/10.1109/TSMC.2014.2327051

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free