Abstract
The first extensive Bus Rapid Transit (BRT) system in the Philippines, the EDSA Busway, was put into place as a result of Metro Manila’s ongoing traffic congestion. This study uses an integrated framework that combines cost–benefit analysis (CBA), commuter perception survey, and traffic simulation to assess its economic, social, and environmental implications. The operational viability and traffic impact of the planned Magallanes BRT station were evaluated through simulation using PTV VISSIM. A total of 385 commuters participated in a survey measuring their impressions of safety, accessibility, and satisfaction using a four-point Likert scale. The Busway’s excellent economic feasibility was confirmed by the CBA results, which showed a Benefit–Cost Ratio (BCR) of 15.38 and a Net Present Value (NPV) of ₱778.64 billion. Results from the simulation showed a 24% decrease in PM2 emissions, a 75% increase in throughput, and a 64% reduction in bus trip time. According to survey results, 61% of commuters said accessibility had improved and 62% said travel satisfaction had increased. The study supports the EDSA Busway’s status as a feasible model for future BRT expansion in Metro Manila and other emerging metropolitan regions by showing how it greatly improves environmental sustainability and mobility efficiency.
Author supplied keywords
Cite
CITATION STYLE
Pineda, J. M. S., Monjardin, C. E. F., & Robles, K. P. V. (2025). Analysis of the EDSA Busway’s Cost Benefit: Impacts for Metro Manila’s Sustainable Urban Transportation Through Bus Rapid Transit (BRT). Future Transportation, 5(4). https://doi.org/10.3390/futuretransp5040178
Register to see more suggestions
Mendeley helps you to discover research relevant for your work.