Stochastic Optimization for Long-Term Planning of a Mining Complex with In-Pit Crushing and Conveying Systems

2Citations
Citations of this article
9Readers
Mendeley users who have this article in their library.
Get full text

Abstract

Semi-mobile in-pit crushing and conveying (IPCC) systems can help reduce truck haulage in open-pit mines by bringing the crusher closer to the excavation areas. Optimizing a production schedule with semi-mobile IPCC requires integrating extraction sequence, destination policy, crusher relocation, conveyor layout, and truck fleet investment decisions. A mining complex with multiple mines and IPCC systems should be optimized simultaneously to find an optimal schedule for the entire value chain. An integrated stochastic optimization framework is proposed to produce long-term production schedules for mining complexes using multiple semi-mobile IPCC systems. The optimization model has flexibility to select the crusher locations and conveyor routes from anywhere inside the pits. The framework uses simulated orebody realizations to consider multi-element grade uncertainty and manage associated risk. A hybrid metaheuristic solution approach based on simulated annealing and evolutionary algorithms is implemented. The method is demonstrated using an iron ore mining complex.

Cite

CITATION STYLE

APA

Findlay, L., & Dimitrakopoulos, R. (2024). Stochastic Optimization for Long-Term Planning of a Mining Complex with In-Pit Crushing and Conveying Systems. Mining, Metallurgy and Exploration, 41(4), 1677–1691. https://doi.org/10.1007/s42461-024-01005-2

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free