Abstract
The author establishes the Yangtze estuary 2D tidal and sediment mathematical model based on the orthogonal curvilinear coordinate system. The erosion and siltation of engineering section under the hydrological conditions of flood season, dry season and the great flood after the Baimao Sand control engineering is calculated. Preliminarily expounds the correlation of Baimao Sand and Biandan Sand and the impact of Biandan Sand after the Baimao Sand control engineering is implemented.
Cite
CITATION STYLE
Zhang, X., Dou, X., & Zhang, J. (2012). STUDY ON INFLUENCE OF BAIMAO SANDBANK CONTROL PROJECT IN SOUTHERN BRANCH OF THE YANGTZE RIVER ESTUARY, CHINA. Coastal Engineering Proceedings, (33), 39. https://doi.org/10.9753/icce.v33.management.39
Register to see more suggestions
Mendeley helps you to discover research relevant for your work.