Abstract
Large-scale integration of renewable energy sources with power-electronic converters is pushing the power system closer to its dynamic stability limit. This has increased the risk of wide-area blackouts. Thus, the changing generation profile in the power system necessitates the use of alternate sources of energy such as wind power plants, to provide black-start services in the future. However, this requires grid-forming and not the traditionally prevalent grid-following wind turbines. This paper introduces the general working principle of grid-forming control and examines four of such control schemes. To compare their performance, a simulation study has been carried out for the different stages of energization of onshore load by a high-voltage direct-current (HVDC)-connected wind power plant. Their transient behaviour during transformer inrush, converter pre-charging and de-blocking, and onshore block-load pickup has been compared and analysed qualitatively to highlight the advantages and disadvantages of each control strategy.
Cite
CITATION STYLE
Jain, A., Sakamuri, J. N., & Cutululis, N. A. (2020). Grid-forming control strategies for black start by offshore wind power plants. Wind Energy Science, 5(4), 1297–1313. https://doi.org/10.5194/wes-5-1297-2020
Register to see more suggestions
Mendeley helps you to discover research relevant for your work.