A Monte Carlo simulator to investigate cell-to-cell deviation in a grid-tied battery pack

3Citations
Citations of this article
12Readers
Mendeley users who have this article in their library.

Abstract

Battery energy storage systems (BESSs) are commonly used in smart grids. Voltage deviation or imbalance among cells generally exists in multi-cell battery packs. This work presents a study of the voltage deviation-related phenomena observed during the operation of a grid-tied BESS, Willenhall Energy Storage System (WESS), including the voltage deviation changes during full range cycle and the cut-off mechanism activated by it. Electroimpedance spectroscopy measurements and equivalent circuit modelling were conducted on the same type of cell as that used in WESS to obtain cell-equivalent circuit parameter distributions (the standard deviation and mean). Cell voltage deviation in a WESS-sized battery pack (> 21k cells) was studied using Monte Carlo simulation through a proposed cell level battery simulator. Both experiments and simulations reveal that high cell voltage deviation emerges at the low and high state-of-charge zones where the cell internal resistance has a large value and large extent of deviation.

Cite

CITATION STYLE

APA

Wang, Z., Wang, Z., Davidson, J., Foster, M., & Gladwin, D. (2022). A Monte Carlo simulator to investigate cell-to-cell deviation in a grid-tied battery pack. IET Power Electronics, 15(13), 1264–1278. https://doi.org/10.1049/pel2.12289

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free