A study on a new distribution system planning with considering distributed generators installation

11Citations
Citations of this article
8Readers
Mendeley users who have this article in their library.

Abstract

This paper proposes a new framework of distribution system planning under the condition of mass installed Distributed Generators (DGs). At present, distribution system planners do not pay much attention to the interconnection of DGs. However, if some DGs can supply power instead of conventional power stations, they will give a significant impact. The planners will have a new option to build a network system plan without unnecessary investment to distribution networks. In this study, an objective function for distribution system planning is formulated to obtain maximum profits for utilities, and the authors discuss reduction of me utilities' investment cost and distribution system loss for installation of DGs. In addition, the authors propose a solution method using a genetic algorithm technique in order to find quasi-optimal solutions for large scale problems. Furthermore, the authors also discuss the connection tariff in order to increase the utilization rate of distribution networks. The advantage of the proposed method is demonstrated through several numerical simulations with successful results.

Cite

CITATION STYLE

APA

Koeda, K., Zoka, Y., Ueyama, T., Yorino, N., & Sasaki, H. (2006). A study on a new distribution system planning with considering distributed generators installation. IEEJ Transactions on Power and Energy. https://doi.org/10.1541/ieejpes.126.789

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free