Utility-based road maintenance prioritization method using pavement overall condition rating

15Citations
Citations of this article
62Readers
Mendeley users who have this article in their library.

Abstract

Pavement maintenance and rehabilitation are expensive activities and the available budget to manage the existing pavement infrastructure is limited. Managers require a prioritization method to assist them in selecting the most appropriate maintenance options. Maintenance prioritization is necessary to maintain pavement sections at acceptable service levels within the given budget and resource constraints. In this paper, a utility approach is proposed for maintenance prioritization purposes based on the condition assessment results of the pavement sections. A pavement network of five sections is considered in this study, and a numerical example is illustrated considering one section to show the implementation of the utility approach for section ranking. The overall assessment of various pavement sections was provided by the inspector as degrees of belief in seven assessment grades, which are: A (Good), B (Satisfactory), C (Fair), D (Poor), E (Very poor), and F (Serious). The assessment of pavement condition and the estimated grade utilities are used to calculate maximum, minimum, and average utilities for each of the five pavement sections. Based on the results, the pavement sections are ranked for maintenance and rehabilitation actions.

Cite

CITATION STYLE

APA

Dabous, S. A., Al-Khayyat, G., & Feroz, S. (2020). Utility-based road maintenance prioritization method using pavement overall condition rating. Baltic Journal of Road and Bridge Engineering, 15(1), 126–146. https://doi.org/10.7250/bjrbe.2020-15.464

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free