A fine-grained parallel algorithm for the cyclic flexible job shop problem

14Citations
Citations of this article
14Readers
Mendeley users who have this article in their library.

Abstract

In this paper there is considered a flexible job shop problem of operations scheduling. The new, very fast method of determination of cycle time is presented. In the design of heuristic algorithm there was the neighborhood inspired by the game of golf applied. Lower bound of the criterion function was used in the search of the neighborhood.

Cite

CITATION STYLE

APA

Bozejko, W., Pempera, J., & Wodecki, M. (2017). A fine-grained parallel algorithm for the cyclic flexible job shop problem. Archives of Control Sciences, 27(2), 169–181. https://doi.org/10.1515/acsc-2017-0010

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free