Cost assessment of a tokamak fusion reactor with an inventive method for optimum build determination

7Citations
Citations of this article
11Readers
Mendeley users who have this article in their library.

Abstract

An inventive method was applied to determine the minimum major radius, R0, and the optimum build of a tokamak fusion reactor that simultaneously meets all physics, engineering, and neutronics constraints. With a simple cost model, tokamak systems analyses were carried out over ranges of system parameters to find an optimum build of a tokamak fusion reactor at minimum cost. The impact of a wide range of physics parameters and advanced engineering elements on costs were also addressed. When a central solenoid was used to ramp up a plasma current, design solutions with a cost of electricity (COE) between 109 and 140 mills/kWh, direct capital cost between 5000 and 6000 M/USD, and net electric power, Pe between 1000 and 1600 MW could be found with a minimum R0 between 6.0 and 7.0 m, and fusion power, Pfusion between 2000 and 2800 MW. When the plasma current was driven by a non-inductive external system, the system size and costs could be reduced further; a COE between 98 and 130 mills/kWh, direct capital cost between 4000 and 5000 M$, and Pe between 1000 and 1420 MW could be found with a minimum R0 between 5.1 and 6.7 m, and Pfusion between 2000 and 2650 MW.

Cite

CITATION STYLE

APA

Jo, G., Kwon, J. M., Cho, A., Chung, H. K., & Hong, B. G. (2021). Cost assessment of a tokamak fusion reactor with an inventive method for optimum build determination. Energies, 14(20). https://doi.org/10.3390/en14206817

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free