Evaluation of trashrack replacement design for malalo intake of singkarak hydro power plant in west sumatera

2Citations
Citations of this article
11Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

Singkarak hydro power plant (SHPP) with the capacity of 175 MW provide essential supply to Sumatera Interconnection System thus reliable and efficient operation of the hydro power plant component must be maintained. With the damaged experienced by the trash rack during Padang earthquake, the operation of the power plant was disturbed and replacement of trash rack need to be executed. This study evaluate the modification of trash rack replacement in terms of head loss, potential energy and revenue losses. This simple evaluation finds that the replacement design gives lower head loss which translated to lower energy and revenue losses. The potential energy and revenue losses also increase exponentially with the increase of trash rack blockage. This result amplify the importance of trash rack design and cleaning during operation of a hydro power plant.

Cite

CITATION STYLE

APA

Kurniawan, E., & Simaremare, A. A. (2022). Evaluation of trashrack replacement design for malalo intake of singkarak hydro power plant in west sumatera. In Journal of Physics: Conference Series (Vol. 2193). Institute of Physics. https://doi.org/10.1088/1742-6596/2193/1/012053

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free