Instrumentation upgrade for Top-Up operations at the Australian Synchrotron

4Citations
Citations of this article
7Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

The Australian Synchrotron introduced Top-Up operations in May 2012. Upgrading the machine for Top-Up has required major developments in many of the accelerator systems. Investigations prior to the start of Top-Up operations demonstrated that the Infrared Microspectroscopy beamline was particularly sensitive to injection noise. A gating event has been implemented as part of our timing system upgrade to pause the data collection during injection. In Top-Up mode injections can happen when the gaps of insertion devices are closed. A variable vertical aperture has been installed in the BTS to scape potentially damaging electrons and protect the equipment. © 2013 IOP Publishing Ltd.

Cite

CITATION STYLE

APA

Van Garderen, E. D., Bambery, K. R., Clift, M., Leblanc, G. S., Martin, D. E., Puskar, L., … Zhu, D. (2013). Instrumentation upgrade for Top-Up operations at the Australian Synchrotron. In Journal of Physics: Conference Series (Vol. 425). Institute of Physics Publishing. https://doi.org/10.1088/1742-6596/425/4/042015

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free