Abstract
One of the important things to do in electric power system operation is load forecasting. Load forecasting consists short term load forecasting and very short term forecasting. The very short-term load forecasting is predicting electrical loads in every 30 minutes. This forecasting is done to decide which plant to operate. The capacity of the plant to be operated adjusts to the load plan to be supplied the next day One method utilized in this research is Fuzzy Logic. This method has been applied for short-term load forecasting and will be employed for very short-term forecasting peak load time. Fuzzy logic expected has a small MAPE (0,6244%).
Author supplied keywords
Cite
CITATION STYLE
Jamaaluddin, J., Hadidjaja, D., Sulistiyowati, I., Suprayitno, E. A., Anshory, I., & Syahrorini, S. (2018). Very short term load forecasting peak load time using fuzzy logic. In IOP Conference Series: Materials Science and Engineering (Vol. 403). Institute of Physics Publishing. https://doi.org/10.1088/1757-899X/403/1/012070
Register to see more suggestions
Mendeley helps you to discover research relevant for your work.