Energy audit and waste heat recovery system design for a cement rotary kiln in Ethiopia: A case study

19Citations
Citations of this article
42Readers
Mendeley users who have this article in their library.

Abstract

This paper deals with the energy audit and heat recovery system modeling and design, taking a cement factory in Ethiopia as a case study. The system is a dry type rotary kiln equipped with a sixth stage cyclone type preheater, pre-calciner and grate cooler. The kiln has a capacity of 3,000 tons/day. The energy auditing has been performed based on the data collected from control volume of the kiln system for a ten-month period. The result shows that 25.23% of the total heat input is released to the environment through the preheater and another 15.58% through the cooler exhausts. The west heat recovery system (WHRS) can produce a gross power of 5.26 MW as long as the kiln is in operation. The generated power can cover all the electrical energy consumption of the kiln system whether there is a power supply from the grid or not. Therefore, the company can save up to 536,222.10 USD per year due to the production of clinker using their own power source and avoiding the loss sustained by the company due to power interruption from the grid.

Cite

CITATION STYLE

APA

Ayu, T. T., Hailu, M. H., Hagos, F. Y., & Atnaw, S. M. (2015). Energy audit and waste heat recovery system design for a cement rotary kiln in Ethiopia: A case study. International Journal of Automotive and Mechanical Engineering, 12(1), 2983–3002. https://doi.org/10.15282/ijame.12.2015.14.0249

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free