Abstract
The existing production scheduling mode ignores ladle dispatching resulting in the increase of energy consumption in ladle heating and instability in production. Hence, we study the energy-efficient integration optimization of production scheduling and ladle dispatching in this paper. Specifically, a mixed integer linear programming model is formulated to coordinate the time-dependent correlations between them and quantify the energy consumption of them. Moreover, an enhanced migrating birds optimization algorithm (EMBO) is proposed to tackle this NP-hard integration optimization problem. In this proposed algorithm, a three-level rule-based heuristic decoding is designed to achieve the optimal solutions at the given production sequence; well-designed neighborhood structures are appended to intensify exploration; a simulated annealing-based acceptance criterion is hired to escape from local optima. Additionally, a novel competitive mechanism for birds regrouping is developed to increase the population diversity by information exchange between the left and right lines of V-formation. Mass experimental results demonstrate that the proposed EMBO observably outperforms all the compared algorithms, and the proposed integration optimization decreases the energy-consumption by 1.21% in the context of constant production efficiency.
Author supplied keywords
Cite
CITATION STYLE
Han, D., Tang, Q., Zhang, Z., & Cao, J. (2020). Energy-efficient integration optimization of production scheduling and ladle dispatching in steelmaking plants. IEEE Access, 8, 176170–176187. https://doi.org/10.1109/ACCESS.2020.3027018
Register to see more suggestions
Mendeley helps you to discover research relevant for your work.