The Selection of Dry Port Location by Analytic Network Process Model: A Case Study of Dosso-Niger

  • Abdoulkarim H
  • Fatouma S
  • Kalgora B
N/ACitations
Citations of this article
7Readers
Mendeley users who have this article in their library.

Abstract

The aim of this paper is to select the best location for the construction of a dry port in Niger which is a land locked country (LLC). Niger is located in the Sahel and has a land area of 1,267,000 square kilometers [1], with the closest port being port of Cotonou in Benin. The transport corridor from Niamey to Cotonou is approximately 1036 km long [2]. It is estimated that this corridor carries about 40 percent of Niger’s overseas trade traffic [3]. In this work, the Analytic Network Process (ANP) model is used to determine the optimal location of the dry port, among three major cities: Niamey (capital city), Dosso and Gaya. From the application of this selection model, Dosso was selected as the best location for the location of the dry port, while Gaya and Niamey were placed second and third respectively. The results obtained in this work strongly confirm the decision of the government of Niger to construct a dry port in Dosso, a project that commenced in 2010 and is still in progress.

Cite

CITATION STYLE

APA

Abdoulkarim, H. T., Fatouma, S. H., & Kalgora, B. (2019). The Selection of Dry Port Location by Analytic Network Process Model: A Case Study of Dosso-Niger. Journal of Transportation Technologies, 09(02), 146–155. https://doi.org/10.4236/jtts.2019.92009

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free