Formula for determining the construction workers productivity including environmental factors

15Citations
Citations of this article
60Readers
Mendeley users who have this article in their library.

Abstract

The aim of this study is to build a mathematical model of the productivity of construction workers. It does so by selecting 17 factors that influence the productivity of construction workers and categorising them into five groups. For the mathematical description of the factors, fuzzy logic was used. A formula for calculating the work productivity of construction workers is proposed. The novelty of the approach proposed by the authors is rooted in the consideration of various factors that have the potential to influence the productivity of construction workers. To present the way the formula operates, a single assessment of ceiling formwork was undertaken. The verification of a model confirmed its capability of analyzing, evaluating, and predicting the productivity of construction workers with satisfying accuracy.

Cite

CITATION STYLE

APA

Malara, J., Plebankiewicz, E., & Juszczyk, M. (2019). Formula for determining the construction workers productivity including environmental factors. Buildings, 9(12). https://doi.org/10.3390/BUILDINGS9120240

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free