In the electricity market of today, with increasing de-mand for electricity production on short notice, the combined cycle power plant stands high regarding fast start-ups and efficiency. In this paper it has been shown how the dynamic start-up procedure of a com-bined cycle power plant can be optimized using JMod-elica.org, proposing a way to minimize the start-up time while maximizing the power production during start-up. The physical models have been developed in Modelica, adapted to suit optimization purposes and extended to optimization problems. Constraints keeping the lifetime consumption of critically stressed components under control are limiting factors. The plant models have been successfully optimized to full load.
CITATION STYLE
Lind, A., Sällberg, E., Velut, S., Gallardo Yances, S., Åkesson, J., & Link, K. (2012). Start-up Optimization of a Combined Cycle Power Plant. In Proceedings of the 9th International MODELICA Conference, September 3-5, 2012, Munich, Germany (Vol. 76, pp. 619–630). Linköping University Electronic Press. https://doi.org/10.3384/ecp12076619
Mendeley helps you to discover research relevant for your work.