Study of dam operating strategy for optimal water management during preventive maintenance period on PLTA Pt.Vale Indonesia

1Citations
Citations of this article
8Readers
Mendeley users who have this article in their library.
Get full text

Abstract

PT. Vale Indonesia has three hydropower plants (called PLTA). They have three dams cascaded in one river. The water sources from three lakes at around company operational area. The hydropower plants are main supporting units for Nickel production. Thus the hydropower plants must be have high performance and long live time. Here the preventive maintenance is needed. This paper discusses about study result of dam operating strategy of the hydropower plants in order to optimal water management during preventive maintenance period, by considering of power demand at the smelting furnace and the auxiliary power. Linear programming is used as an optimization method. It is proved that the electric energy of 15616.8 MW hours be obtained through water flow rate of 17625.6 m3/seconds, for 2015's operation.

Cite

CITATION STYLE

APA

Sunusi, R., & Indriawati, K. (2019). Study of dam operating strategy for optimal water management during preventive maintenance period on PLTA Pt.Vale Indonesia. In AIP Conference Proceedings (Vol. 2088). American Institute of Physics Inc. https://doi.org/10.1063/1.5095312

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free